1950-1955 : The prototypes
The choice of the site
Construction
EDF or BEST photographs
Access to the site
Establishment of the site
The team
Design features
The wind turbine commented
Sights on the wind turbine
Close-ups on the wind turbine
The measuring station
Tilting the wind turbine
1959: Record of production
Disassembling the generator
Some figures
Documentation
1966: the scraping
What is left of the wind turbine?
Great power wind turbines
Where are the archives?
Lucien Romani
L. Romani & l'O.N.E.R.A.
Rauline Report and the N.A.S.A.
Acknowledgments
French wind links
Legal notice
Site map
Who am I?

Some close-ups on specific points of the wind turbine.

Construction of the tripod by the Société de Construction Métallique Besson et Lepeu in Montereau Fault Yonne
© Jean-Jacques Béguine

Construction of the tripod by the Société de Construction Métallique Besson et Lepeu in Montereau Fault Yonne
© Jean-Jacques Béguine
Eolienne_017_01.png
The right north leg saw from the tripod.
At the base, the steel plate reinforced by vertical sails allowing the leg to pivot when tilted.
On the left, a cable tray.
eolienne_026_02.png
North left leg seen from the same place.
This leg supports the staircase to the lower platform of the tripod.
Eolienne_027_02.png
Cable tray along with the tripod.
(Click on the pictures to see their actual size).

Last update: May-17-2021 19h51 CEST